
Add to Cart
Belparts excavator hydraulic control valve SY215C hydraulic main control valve
Main parts as below:
PARTS | PARTS NAME |
hydraulic parts | pump assy, final drive, gearbox, drive motor, swing device, swing motor, piston shoe, cylinder block, valve plate, set plate, travle motor, rotary motor and gearbox, main valve, steering pump, gear pump, valve block, control valve |
engine parts | Cylinder Block, Cylinder Head, Cylinder Liner, Cylinder Gasket, Overhaul kit,Crankshaft, Camshaft, Main Bearing,Water Pump, Oil Pump, Air Compressor, Fuel transfer pump,Piston, Piston Pin, Piston Ring, liner kits,Connection Rod, Bushing, Gear, Gear Housing, Belt Tensioner |
The main machine's model as below:
Brand | Model |
PC40, PC60-5-6-7, PC100, PC120, PC130, PC240, PC270, PC300,PC360,PC400,PC450,PC650,PC1250 PC200-1-3-5-6, PC220-1-3-5, PC300-3-5, PC400-1-3-5, D20, D30, D31, D50, D60, D75, D80 (D85), D155 | |
EX40, EX60, EX150, EX100M, EX100, EX120, EX150, EX200-1-2-3, EX300-1-3-5, EX400, ZX450,ZX470,ZX870,ZX1200 | |
EC55/60, EC140,EC210, EC240, EC290, EC360, EC460, EC700 | |
Doosan | DH215, DH220, DH260, DH280, DH300, DH370, DH420, DH450, DH500 |
Hyundai | R200, R210, R225, R265, R335, R455, R505 |
Kato | HD250, HD400 (HD450), HD500, HD550, HD700 (HD770), HD800, HD820, HD850, DH880, HD1020, HD1220 (HD1250), HD1430, DH1880 |
Kobelco | SK200,SK210, SK220,SK260, SK300, SK330, SK350, SK450,SK460,SK480,SK800 |
Sumitomo | SH120, SH200, SH280, SH300, SH350, SH400, SH450, SH460, SH700 |
Customer Review
We always adhere to the concept of customer first and try our best to provide customers with the best pre-sales and after-sales services.
Factory Superiority
Our advantages
1.Strong part number database.
If you can provide the right model and part number, we can supply the right product.
2.Professional and experienced salesperson.
Our founder has been into this field for more than 7 years, with rich experiences.
3.Strict and complete company rules.
We will try our best to meet customer’s delivery time. Before delivery, we must verify the part number or pictures of products one by one, to make sure that customers can receive high-quality and right-quantity goods.
4.Good management system.
No matter how big or small order, as long as customers place the order, we will provide exporting service free for charge.
5.Good service attitude.
If the customer has any questions about the product, In our receiving and knowing the situation, we will help the customer to solve the problem in the first place.As long as customers’ requirements are reasonable, we will endeavour to make them satisfied.
FAQ:
Q: How to guarantee the same?
A: Before sending, I will take pictures. After confirmation, I send.
Q: When to ship?
A: Once getting payment then arrange.
Q: Import customs fee?
A: It depends on import country. I can make lower valve so that you can pay lower customs fee even no need to pay.
Q: How long for transport?
A: For express/ air, it takes about 5 days. For land/ sea, it takes about one month. It depeds on your address.
Q: Product usage?
A: If any problem about usage, I will solve at first time.